Maintain BOM Parameters Session: tibom0100m000 Application: This session defines parameters relevant to Bill of Material Field Data: 1.BOM Unit of Measurement The unit in which the length and width are specified on production bills of materials. This unit is displayed after the fields "Length" and "Width" in various sessions of BAAN Manufacturing. The data to be entered must be defined in the session "Maintain Units (tcmcs0101m000)". 2. Description Description of Bill of Material. 3. Maintain BOM by Operation The value of this field determines how data is maintained in the session "Maintain Production BOMs (tibom1110m000)" and how the session "Enter Material Issue for Production Orders (ticst0101m000)" is used. If Yes, then while you enter data in the session "Maintain Production BOMs (tibom1110m000)", the system will ask you to type in the item code as well as the operation, allowing you to define a bill of material by operation. Consequently, the session "Enter Material Issue for Production Orders (ticst0101m000)" must be run by operation. In actual practice, you define a bill of material by operation for items with a longer lead time. Thus, you prevent components from being stocked too early, either in the warehouse or on the shop floor. If No, then while entering data in the session "Maintain Production BOMs (tibom1110m000)", you only type in the item code, after which you can define the components that make up the end item.
Monday, January 25, 2010
Baan BOM Parameters
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment